Semmes Lake Dam Reconstruction

Project Location: Fort Jackson, South Carolina
Prime Contractor: Husman Environmental & Construction, LLC and RC Construction Co., Inc. a Joint Venture
Project Size: $16.78 Million
Project Manager: Lynn Wolfe, Husman Environmental & Construction, LLC
lwolfe@husmanenvironmental.com
Work for this project includes:

Semmes Lake Dam Reconstruction will be classified as an intermediate, high hazard, earthen dam. Reconstruction consists of removing the remaining embankment material and reconstructing the embankment. Reconstruction will also include a controlled concrete outlet works, a 4′ x 4′ outlet gate and a three-stage labyrinth weir. The dam is approximately 970 feet long, with maximum height of 29 feet above the lake bed. The three-stage weir will be designed to keep a normal pool at elevation 215.0′ (NAVD88), with secondary and tertiary cycles at 215.5′ and 219.2′, respectively. There is no emergency spillway, the primary spillway is designed to handle a 100,000 year flood with no overtopping of the dam embankment. With the proposed storage capacity and height, the dam is classified as an intermediate size dam, according to Table 5-1 of AR 420-1.

Semmes Lake

Preconstruction Planning

Preconstruction Planning

General Contracting

General Contracting

Design – Build

Design - Build

Construction Management

Construction Management

Engineering and Design

Engineering and Design
SAME
WEF
AWWA